Besides experiments on hydraulic model of the head of the border data flows upstream of the measured data of 2000, 2001, 2004, 2005, 2007, need to do some real serious with marginal flood flow frequency interest 0.5%, 1%, 5%, 10% and 20%.
In calculating 2 schemes used on edge: Minutes on the design flood discharge through existing works and plans on reducing small margin under document Institute Southern existing water resources planning - View hydrology report)
正在翻譯中..