Current course when we put the issue surrounding the region I to lower the water level, then the region I flood through this route can only be performed in conditions of no rain in the infield, have combined with the upper works (outdoor, Oil) and operation of the KSL works. The flood through the slit drain Inspection will be more thorough in the operating table works
正在翻譯中..