a) For service works Blast Furnace No. 1:
- FHS has completed the work item and gas handling equipment for the work items to ensure they reach NTR 51: 2013 / BTNMT, NTR 19: 2009 / BTNMT and NTR 22: 2009 / BTNMT column B to operate the blast furnace No. 01.
- emission monitoring equipment automatically, continuously has installed 08 facilities, 05 of the power plant smokestacks and chimneys 01 Workshop of sintered No. 2 (08 parameters: flow, temperature, pressure, O2, dust, SO2, NOx and CO); 01 of blast furnace chimney 1 (05 parameters: temperature, dust, SO2, NOx and CO); 01 general chimney coking furnaces No. 1 and 2 (03 parameters: dust, SO2, NOx). The remaining 07 emissions monitoring equipment automatically, continuously not installed include 01 Lime kilns chimney 1; 04 chimneys of the factory heating furnaces, hot-rolled; 02 rolled wire factory chimneys. Details handling equipment and automated emission monitoring, continuous in Appendix 1 attached.
Currently, 09 emission monitoring equipment continuously, automatically transfers data to the Department of Natural Resources and Environment Ha static and VEA (No. 1 blast furnace chimney; sintering machine No. 1, No. 2 sintering machine; coke oven No. 1; 03 stations and 02 stations burning coal and gas fired thermal power plant).
正在翻譯中..