(c) the storage file is prevailing two horizontal building channel lyùä bôø with beà width is 5 m to reduce project cost, and the standard width beà roads to manage a channel defined as follows
(C) administer Street lyua two vertical channel CONSTRUCTION THAT PARTY IS BOO Width with 5m of funding to turn down the Project, and standards about Width sugar management for the channel as defined as follows