In addition to the great tribute as did the statistics in the table above, the tribute is under levees on the cover must be closed in order to build the entire research area certainly warrants for controlling the water level. The drain works in automatic mode had two-way door width from 10 m to 5 m with the number 40 and some drain through the small type quite associated embankment system on the existing transport and planning should scale the embankment online scale-dependent transportation. However, the high the levees not lower +2, 50 m and has a standby upgrade when considering water runoff, likely in the future. The length of the dike was in the statistics table 9
正在翻譯中..